Building data:
Location: Lahr, Schwarzwald
Länge/Breite/Höhe: 433 / 217 / 15,5 bzw. 10,0
Floor space: ca. 127.000 qm
Building type: Distribution centres
Property Description:
In total, 25 high-efficiency ventilation systems with heat recovery and heating/cooling function compliant with “ErP 2016” have been delivered to the client. All HVAC systems use gas engine heat pumps produced by KKU Concept. The EcoSmart control unit includes a cloud function and our “TrendViewer” so that any control deviations are immediately reported via e-mail.
The logistics building project will be realised on a 185,000 m² property in Lahr. The storage building is separated in to 8 sections of different heights and a large mezzanine area. A three-storey office wing will be created in the front area.
Klima bestellt, prima geliefert
Europas führende Mode-Online-Plattform Zalando hat in Lahr ein 130.000-Quadratmeter-Logistikzentrum eröffnet. MultiCross übernahm die Klimatisierung. Als wären die technischen Herausforderungen nicht genug gewesen, stand auch noch eine neue EU-Effizienzrichtlinie an - mit unklaren Vorgaben.
Frühjahr 2017, Lahr
Männer und Frauen schieben kleine Wagen durch die Gänge. Links und rechts Schuhkartons, verpackte Hüte, T-Shirts, Lederjacken, Sportsocken und BHs. Immer wieder blicken sie auf den Monitor ihrer Scanner, greifen in die Regale und bringen die Waren zu einem Fördersystem, das sie weiter zu den Verpack- und Versandstationen leitet. Christof Krause lässt kurz einen Mitarbeiter mit Wägelchen vorbei und atmet tief ein. „Gute Luft hier.
Hier finden Sie den Bericht.
© Copyright 2014 - multicross.de